Contact & RFQ
One form, matched factories, first quote within 48 hours.
After you hit submit
Your RFQ goes to a sourcing engineer in Shenzhen, not a sales queue. We map it against audited Guangdong computing-hardware factories that are booked into next year, then check which lines still have open capacity for your power class. For busway, we shortlist IEC 61439-6 type-tested systems up to 6300 A such as Schneider I-Line or Legrand XCP. For rack PDUs, we match Server Technology PRO4X-class switched units with 11-22 kW output and billing-grade metering accuracy of ±1% when the spec requires it.
Most rack PDU projects start at MOQ 10-100 pcs with a 15-30 day lead time from Shenzhen. BBU requests move into an OCP Open Rack V3 BBU Shelf Rev 1.1 review on 48V architecture; battery packs require UN38.3 Class 9 sea freight and UL 1973 plus UL 9540A documentation before we quote. We flag appliance-level compliance early: UL 62368-1 for PDU/PSU, UL 857 for busway. If transformers are the bottleneck, remember lead times reached 160 weeks globally; we can often start with busway and CRPS while you source the dry-type unit.
Direct line and Shenzhen hours
Email sourcing@dcpower.com with drawings, target quantities, and destination port. The Shenzhen team works 09:00–22:00 CST to cover EU and US mornings; the Hong Kong logistics desk handles UN38.3 Class 9 sea freight and consolidation.
- Direct email: sourcing@dcpower.com
- Hours: 09:00–22:00 CST, Monday–Saturday
- First quote: within 48 hours for PDU and CRPS RFQs
- Tariff review: 46.6% on Chinese dry-type transformers, some lines +125%

Frequently asked
Word from the sourcing floor
“The buyers who win in 2026 are the ones who stop asking for a single component quote and start asking for a power-chain match—PDU, busway, BBU and CRPS from one audited Shenzhen cluster.”