Power for the AI Era
The world's data centers are sold out of power equipment. Transformer lead times have reached 160 weeks, AI racks have crossed 120 kW, and half of planned US projects are slipping. DC Power matches your rack-level requirements — PDU, BBU, busway, CRPS and liquid cooling — to audited Shenzhen manufacturers, with quotes inside 48 hours.
Five product lines, one supply chain
Each line below maps to a dedicated sourcing hub with specification tables, certification guidance and manufacturer-matching. No factory tour required before your first quote — we handle qualification for you.
Certification routing is where most cross-border orders stall: UL 62368-1 for North American racks, IEC 61439-6 type testing for European busway, UN38.3 documentation for battery lines. Our suppliers arrive with the certificate package already matched to your target market, which removes the most common cause of a three-month customs delay.

Rack PDU
Basic to intelligent, 5 kW to 22 kW, IEC C13/C19, UL 62368-1, ±1% billing-grade metering.
VIEW LINE →
BBU Modules
OCP Open Rack V3 48V backup shelves, Li-ion modules, UL 1973 / UL 9540A certified.
VIEW LINE →
Busway & Busbar
Compact insulated trunking to 6300 A, tap-off boxes, cast resin sections, copper or aluminum.
VIEW LINE →
Server PSU / CRPS
3200W titanium class, 96% efficiency, ORv3 48V architecture, N+N redundancy.
VIEW LINE →
Liquid Cooling CDU
300 kW to 1.2 MW coolant distribution units, cold plates and UQD manifolds for 120 kW+ racks.
VIEW LINE →
Custom / OEM
Mixed-spec rack power shelves, integrated busbar + PDU assemblies, project-specific builds.
TALK TO US →Copper is the constraint. We know where the slots are.
Copper busbar demand for AI servers drove one major Chinese supplier to 204% profit growth in a single half. Busway runs above 2500 A are now project-specific builds with reserved copper allocation — not catalog items. Guangdong power-hardware factories are booking orders into next year, and the difference between a 12-week and a 40-week delivery is which factory you can actually reach.
- Direct factory slots in the Pearl River Delta — no broker chains between you and the line
- Certification routing: UL 62368-1 for North America, IEC/CE for Europe, SAA for Australia
- LME-indexed copper pricing on busway and PDU contracts, so you are never quoted a stale price
- Qualification data on every supplier: audit trail, production calendar, reference sites above 60 kW per rack
Built for the sectors that cannot wait

AI & Hyperscale
120 kW+ racks, 48V distribution, BBU ride-through.

Colocation & Edge
Billing-grade ±1% metering, 0U PDUs, remote switching.

Telecom & 5G
-48V retrofits, Li-ion BBU swaps, live-network cutovers.

Healthcare
2N redundancy, isolation transformers, UL 60601 constraints.

Industrial Automation
400V three-phase, IP-rated enclosures, spares planning.

Rail & Metro
EN 50155 certified power, wide temperature, seismic-rated.
From RFQ to shipment in four steps
Most buyers lose weeks guessing which factory actually has an open production slot. We maintain live capacity calendars for our network, so your RFQ lands only on lines that can ship in your window — and the first quote still arrives within 48 hours.
Submit your RFQ
Specs, quantity, target market. The form takes under two minutes; we respond within 48 hours.
Factory matching
We route your RFQ to 2-3 audited manufacturers matched by category, certification and capacity slot.
Quotes & samples
You compare landed-cost quotes with LME-indexed copper pricing. Sample units before committing.
Inspection & ship
Third-party pre-shipment inspection, UN38.3 documentation for battery lines, FOB/CIF/DDP terms.
Certifications we route by market
Before you ask
Your project is competing with the world for power equipment.
Start the RFQ now — the factory slot you need this quarter is being quoted to someone else this week.