AI DATA CENTER POWER · SHENZHEN

Power for the AI Era

The world's data centers are sold out of power equipment. Transformer lead times have reached 160 weeks, AI racks have crossed 120 kW, and half of planned US projects are slipping. DC Power matches your rack-level requirements — PDU, BBU, busway, CRPS and liquid cooling — to audited Shenzhen manufacturers, with quotes inside 48 hours.

48h RFQ response UL / IEC certified supply MOQ from 10 pcs 15-30d PDU lead time
Copper-lit data center server aisle
160w
global transformer lead time — power equipment is the new bottleneck
120kW
per-rack density where liquid cooling and dense power become mandatory
6300A
maximum busway ampacity we source (IEC 61439-6 type tested)
96%
80 PLUS Titanium CRPS efficiency — 3200W class server power
CAPABILITIES

Five product lines, one supply chain

Each line below maps to a dedicated sourcing hub with specification tables, certification guidance and manufacturer-matching. No factory tour required before your first quote — we handle qualification for you.

Certification routing is where most cross-border orders stall: UL 62368-1 for North American racks, IEC 61439-6 type testing for European busway, UN38.3 documentation for battery lines. Our suppliers arrive with the certificate package already matched to your target market, which removes the most common cause of a three-month customs delay.

WHY IT WORKS

Copper is the constraint. We know where the slots are.

Copper busbar demand for AI servers drove one major Chinese supplier to 204% profit growth in a single half. Busway runs above 2500 A are now project-specific builds with reserved copper allocation — not catalog items. Guangdong power-hardware factories are booking orders into next year, and the difference between a 12-week and a 40-week delivery is which factory you can actually reach.

  • Direct factory slots in the Pearl River Delta — no broker chains between you and the line
  • Certification routing: UL 62368-1 for North America, IEC/CE for Europe, SAA for Australia
  • LME-indexed copper pricing on busway and PDU contracts, so you are never quoted a stale price
  • Qualification data on every supplier: audit trail, production calendar, reference sites above 60 kW per rack
See How We Vet Factories
Macro close-up of stacked copper busbar
HOW IT WORKS

From RFQ to shipment in four steps

Most buyers lose weeks guessing which factory actually has an open production slot. We maintain live capacity calendars for our network, so your RFQ lands only on lines that can ship in your window — and the first quote still arrives within 48 hours.

1

Submit your RFQ

Specs, quantity, target market. The form takes under two minutes; we respond within 48 hours.

2

Factory matching

We route your RFQ to 2-3 audited manufacturers matched by category, certification and capacity slot.

3

Quotes & samples

You compare landed-cost quotes with LME-indexed copper pricing. Sample units before committing.

4

Inspection & ship

Third-party pre-shipment inspection, UN38.3 documentation for battery lines, FOB/CIF/DDP terms.

COMPLIANCE

Certifications we route by market

UL 62368-1PDU & PSU safety · North America
IEC 61439-6Busway type testing · Global
UL 1973 / 9540ABBU battery safety · USA
80 PLUS Titanium96% CRPS efficiency
QUICK ANSWERS

Before you ask

We are a sourcing hub: we do not manufacture, and we do not pretend to. We match your RFQ to audited Shenzhen factories, supervise qualification, and earn our fee from the supply side — your pricing is factory-direct.
PDUs from 10 pieces, BBU modules from 50, CRPS power supplies from 100. Busway is project-based and quoted per run. Pilot orders are welcome — we recommend them.
Yes. BBU lines ship under UN38.3 documentation as Class 9 dangerous goods by sea, with the certificate package your freight forwarder will require.

Your project is competing with the world for power equipment.

Start the RFQ now — the factory slot you need this quarter is being quoted to someone else this week.

Request a Quote →