Five product lines, one audited supply chain
Every line below has its own specification tables, certification routing and manufacturer pool. Pick a line, read the specs, send one RFQ — we do the factory matching inside 48 hours.
Lines at a glance
| Product line | Range we source | Key certifications | Typical lead time |
|---|---|---|---|
| Rack PDU | Basic to intelligent, 5 kW – 22 kW, 0U/1U/2U | UL 62368-1, CE, FCC | 15 – 30 days |
| BBU Modules | OCP ORv3 48V, 1U/2U modules, 10–20 kW shelves | UL 1973, UL 9540A, UN38.3 | 30 – 45 days |
| Busway & Busbar | 100 A – 6300 A trunking, tap-offs, cast resin | IEC 61439-6, UL 857 | 4 – 8 weeks |
| Server PSU / CRPS | 3200 W class, 80 PLUS Titanium 96%, 48V ORv3 | UL 62368-1, CB | 20 – 40 days |
| Liquid Cooling CDU | 300 kW – 1.2 MW CDU, cold plates, manifolds | CE, LVD | 6 – 10 weeks |
What changes when you route through us
| Signal | Why it matters |
|---|---|
| 160-week transformer lead times | Rack-level equipment is now the long pole — order it in parallel, not after |
| 120 kW AI racks | PDU and busway specs you wrote last year are undersized this year |
| +204% copper supplier profit | LME-indexed quotes protect you from stale fixed pricing |
| Factories booked into next year | Live capacity calendars beat broker guesswork |
- Every supplier holds a third-party audit trail, not just ISO certificates
- Certification routing matches your target market before the first sample ships
- Pilot orders encouraged: 5% of volume first, remainder after factory acceptance
- Battery lines ship with UN38.3 and MSDS documentation as Class 9 sea freight
- 48-hour first response on every RFQ — measured, not promised
Choose your line
Rack PDU
Four classes, one question: which outlets and what metering? Start with the parameter matrix.
OPEN LINE →BBU Modules
Rack-level 48V backup per the OCP Open Rack V3 spec — modules, shelves and ride-time math.
OPEN LINE →Busway & Busbar
Copper from 100 A to 6300 A, tap-offs every half meter, cast resin sections.
OPEN LINE →Server PSU / CRPS
3200 W titanium modules on the ORv3 48V architecture, hot-plug and N+N ready.
OPEN LINE →Liquid Cooling CDU
300 kW to 1.2 MW distribution units, cold plates and UQD manifolds.
OPEN LINE →Custom / OEM
Mixed rack power shelves and project-specific assemblies across multiple lines.
TALK TO US →Frequently asked
Not sure which line your project needs?
Send the rack density and destination market. We will come back with the right line, specs and factory options within 48 hours.